Ruth High Pressure Injection Water Stopping System Construction Pictures Demonstration
Figure 1: Underground Structure Water Leaking
Figure 2: Underground Area Water Leaking
Figure 3: Drill At Where It Leaks
Figure 4: Bury and Lock up the Packer
Figure 5: Connect With Grease Head
Figure 6: Injecting
Figure 7: The Next Day After Injection, Remove Extravasation
Figure 8: Wash Machine With Toluene
Figure9: Subway Station Water stopping
Figure 10: Shanghai Wusong Road outer Elevated Road Tunnel Water stopping
Figure 11: Shanghai No.1 Subway Tunnel Water Stopping
Figure 12: Shanghai Jinguang Bund Basement Water Stopping

   