1. Stored in a clean, dry, and tightly sealed iron drum, the volume can be customized according to customer needs.
2. During transportation, prevent rain, exposure, squeezing, and collision to ensure that the packaging remains intact.
3. The product should be stored in a ventilated, dry, and cool place to prevent direct sunlight and rain. The storage temperature should not exceed 40℃.
4. Under normal storage conditions, the shelf life is 6 months.
Suitable for: Indoor/Outdoor structural bonding, hollow tiles, screed repair.
Not Suitable for: Heavy-duty underground parking lot soil stabilization or lifting sunken slabs (for these applications, please use our Hydrophobic Polyurethane Grout).
Comparison : RUTH EP-02 vs. RUTH EP-03
EP-02 is a Structural Adhesive designed to "weld" cracked concrete back into a monolithic structure.
EP-03 is a Reinforcement & Bonding Agent designed to fill voids, repair hollow tiles, and re-bond delaminated layers
Technical Specifications Comparison
Feature |
RUTH EP-02 |
RUTH EP-03 |
Product Name |
Structural Epoxy Resin Grouting |
High-Strength Reinforcement Grouting |
Compressive Strength |
≥ 110 MPa (Extreme) |
52 MPa (High) |
Mixing Ratio (Weight) |
5 : 1 (A:B = 100:20) |
1 : 1 (A:B = 10:10) |
Packaging |
20kg + 4kg Set |
10kg + 10kg Set |
Viscosity |
Low (Penetrates 0.05mm cracks) |
Ultra-Low (Water-like penetration) |
Primary Function |
Structural Restoration: Restores load-bearing capacity. |
Void Filling & Bonding: Eliminates hollow sounds and re-bonds layers. |
A. Strength & Performance
EP-02 (The Structural Titan): With a compressive strength of ≥110 MPa, it is more than twice as strong as standard high-grade concrete (C40/C50). It is designed to withstand extreme structural loads and tensile forces.
EP-03 (The Precision Bonder): With a strength of 52 MPa, it is stronger than standard concrete (C30) but is engineered for bonding rather than extreme load-bearing. It is rigid enough to solidify loose masonry or flooring but optimized for filling voids.
EP-02 Use Cases (Critical Infrastructure):
Repairing structural cracks in bridges, dams, and highways.
Reinforcing load-bearing beams and columns after earthquake damage.
Any scenario where the safety of the structure is at risk.
EP-03 Use Cases (Renovation & Maintenance):
Hollow Tile Repair: Injecting beneath loose tiles to re-bond them without removing the floor.
Floor Delamination: Fixing separation between the screed and the base concrete slab.
General Reinforcement: Consolidating loose masonry walls or general concrete voids.
EP-02: Requires a strict 5:1 mixing ratio. Typically applied using single-component injection pumps (pre-mixed) by professional structural engineers.
EP-03: Features a convenient 1:1 mixing ratio. This reduces mixing errors and allows for easier handling, making it suitable for general contractors and renovation teams.
One-Sentence Marketing Distinction
Sell EP-02 when: "The main beam of a building has cracked, or a bridge needs structural repair." (Safety Critical)
Sell EP-03 when: "The floor tiles sound hollow, or the warehouse floor screed is peeling off." (Maintenance & Finish)
Call to Action:
Need a solution for hollow tiles or concrete void filling?
[ Contact Us for Technical Support ]